top of page
Без назви (1920 × 1080 пікс.) (15) (1).png

CASE STUDY

SGS Energy used innovative technology to install solar panels with Hyra

“Hyra sourced a leading-edge solution for our recent warehouse solar panel install. Their solution saved us three weeks' plant hire and labour, saving us money and increasing our efficiency.”

Phil Gooby, Director

SGS Energy Case Study – Solar Panels Imagery
SGS-Energy2.jpg

In this story

Bespoke
Solutions

Innovation

Access

Programme
Reduction

Financial
Savings

Profile of equipment used

  • Geda SolarLift

  • Boom lifts

  • Fencing

  • IPAF training

About

SGS Energy are specialists in renewable energy solutions working with both domestic and commercial clients. They advise on and install a variety of energy solutions, from solar panels and battery storage, to ground and air source heat pumps and mechanical ventilation.

Working with Hyra

SGS Energy came to Hyra to install a huge number of solar panels on the roof of a warehouse. They wanted a safe and efficient way to lift the panels into place, without extending their programme. They worked closely with our solar specialist, who knows the market inside-out and was able to offer a solution not widely seen in the UK. He sourced a Geda SolarLift, manufactured in Germany, to install the panels.

 

This innovative solution meant the panels were lifted safely and highly efficiently to rooftop level, thereby alleviating the need for manual hoists, plus the associated risks of panel damage in high winds and possible breaches of health and safety requirements when the panels shatter and fall to ground. The solution saved 3 weeks' labour costs and shaved 3 weeks off the completion date.

Hyra was SGS’s first port of call for this project, having provided good customer service and high quality kit on previous jobs. For this particular project, Hyra supplied boom lifts and fencing as well as IPAF training for staff to safely operate the powered access plant.

Benefits of working with Hyra

Без назви (1920 × 1080 пікс_edited.png

Hire desk service

The relevant Hyra expert advises on a solution to meet your project’s needs. Hyra then source the kit from our supply chain.

Без назви (1920 × 1080 пікс.) (8).png

Minimises disruption

Time critical deliveries and collections – quick on/off to minimise disruption.

Без назви (1920 × 1080 пікс_edited.png

Training

Professional safety and operational training coordinated by the Hyra team.

1

"Hyra reduced our programme by three weeks."

Знімок_екрана_2023-02-08_182728-removebg

Ready to start using Hyra for your Plant Hire management?

We sort it. Simple.

Get in touch to see how simple we can make it for you.

Без назви (1920 × 1080 пікс_edited.png
Без назви (1920 × 1080 пікс_edited.png

Nationwide Delivery

Без назви (1920 × 1080 пікс_edited.png

Expert Advice

bottom of page